TPS54873EVM

Mfr. #: TPS54873EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR TPS54873
Lifecycle: New from this manufacturer.
Datasheet: TPS54873EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54873EVM Overview

Product belongs to the SWIFT series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 4 V ~ 6 V voltage input This product features 'Frequency-Switching' at 700kHz for optimal performance. Output voltage: 3.3V Buck regulator topology - Included item: Board. IC package type: TPS54873 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS54873. Our product measures 76.2 mm x 76.2 mm in dimensions for compact and convenient use. Input Voltage Range: 5 V

TPS54873EVM Image

TPS54873EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54873EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series SWIFT
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4 V ~ 6 V
  • Frequency-Switching 700kHz
  • Current-Output 8A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS54873
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS54873
  • Dimensions 76.2 mm x 76.2 mm
  • Input-Voltage 5 V

TPS54873EVM

TPS54873EVM Specifications

TPS54873EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is SWIFT.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 4 V ~ 6 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 700kHz.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 3.3V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS54873.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS54873

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 76.2 mm x 76.2 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$11.58
$11.58
10
$11.00
$110.01
100
$10.42
$1 042.20
500
$9.84
$4 921.50
1000
$9.26
$9 264.00
Top