TPS55065EVM

Mfr. #: TPS55065EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TPS55065
Lifecycle: New from this manufacturer.
Datasheet: TPS55065EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS55065EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Up or Down is the Main-Purpose. 1.5 V ~ 40 V voltage input This product features 'Frequency-Switching' at 440kHz for optimal performance. Output voltage: 5V Buck-Boost regulator topology - Included item: Board. IC package type: TPS55065 Board type: Fully Populated. The product has 1, Non-Isolated outputs. This tool is designed for the TPS55065.

TPS55065EVM Image

TPS55065EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS55065EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 1.5 V ~ 40 V
  • Frequency-Switching 440kHz
  • Current-Output 500mA
  • Voltage-Output 5V
  • Regulator-Topology Buck-Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS55065
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Tool-Is-For-Evaluation-Of TPS55065

TPS55065EVM

TPS55065EVM Specifications

TPS55065EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Up or Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 1.5 V ~ 40 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 440kHz.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 5V.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck-Boost.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS55065

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 1, Non-Isolated.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS55065.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top