TPS65252EVM

Mfr. #: TPS65252EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TPS65252
Lifecycle: New from this manufacturer.
Datasheet: TPS65252EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65252EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: PMIC Solutions The Power Management, Integrated Power Supply is the Main-Purpose. Primary-Attributes: 2 Step-Down Converters, 1 USB Switch IC package type: TPS65252 This tool is designed for the TPS65252.

TPS65252EVM Image

TPS65252EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65252EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type PMIC Solutions
  • Main-Purpose Power Management, Integrated Power Supply
  • Primary-Attributes 2 Step-Down Converters, 1 USB Switch
  • Embedded No
  • Utilized-IC-Part TPS65252
  • Tool-Is-For-Evaluation-Of TPS65252

TPS65252EVM

TPS65252EVM Specifications

TPS65252EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Integrated Power Supply.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 2 Step-Down Converters, 1 USB Switch.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS65252

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS65252

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$122.68
$122.68
10
$116.55
$1 165.51
100
$110.42
$11 041.65
500
$104.28
$52 141.15
1000
$98.15
$98 148.00
Top