TPS6735EVM

Mfr. #: TPS6735EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR TPS6735
Lifecycle: New from this manufacturer.
Datasheet: TPS6735EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS6735EVM Overview

Product belongs to the - series. The DC/DC, Negative Inverter is the Main-Purpose. 4 V ~ 6.2 V voltage input This product features 'Frequency-Switching' at 160Hz for optimal performance. Output voltage: -5V Inverting regulator topology - Included item: Board. IC package type: TPS6735 Board type: Fully Populated. The product has 1, Non-Isolated outputs.

TPS6735EVM Image

TPS6735EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS6735EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Main-Purpose DC/DC, Negative Inverter
  • Voltage-Input 4 V ~ 6.2 V
  • Frequency-Switching 160Hz
  • Current-Output 200mA
  • Voltage-Output -5V
  • Regulator-Topology Inverting
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS6735
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated

TPS6735EVM

TPS6735EVM Specifications

TPS6735EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Negative Inverter.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 4 V ~ 6.2 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 160Hz

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed -5V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Inverting.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS6735.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$96.70
$96.70
10
$91.87
$918.70
100
$87.03
$8 703.45
500
$82.20
$41 099.65
1000
$77.36
$77 364.00
Top