| Mfr. #: | TPS7B6950EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVALUATION MODULE TPS7B6950 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | TPS7B6950EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Linear Voltage Regulators Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C 5.5 V ~ 40 V voltage input Output voltage: 5V Included item: Board. IC package type: TPS7B6950-Q1 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Fixed. Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product is an TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module. This tool is designed for the TPS7B6950. Input Voltage Range: 5.5 V to 40 V Output current: 150 mA

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6950EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Linear Voltage Regulators
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: What is the Operating-Temperature of the product?
Q: The Operating-Temperature of the product is -40°C ~ 125°C.
A: Is the cutoff frequency of the product Voltage-Input?
Q: Yes, the product's Voltage-Input is indeed 5.5 V ~ 40 V
A: Is the cutoff frequency of the product Voltage-Output?
Q: Yes, the product's Voltage-Output is indeed 5V
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TPS7B6950-Q1.
A: Is the cutoff frequency of the product Board-Type?
Q: Yes, the product's Board-Type is indeed Fully Populated
A: At what frequency does the Channels-per-IC?
Q: The product Channels-per-IC is 1 - Single.
A: Is the cutoff frequency of the product Regulator-Type?
Q: Yes, the product's Regulator-Type is indeed Positive Fixed
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C
A: What is the Description-Function of the product?
Q: The Description-Function of the product is TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TPS7B6950.
A: At what frequency does the Input-Voltage?
Q: The product Input-Voltage is 5.5 V to 40 V.
A: Is the cutoff frequency of the product Output-Current?
Q: Yes, the product's Output-Current is indeed 150 mA