TRF3722EVM

Mfr. #: TRF3722EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TRF3722
Lifecycle: New from this manufacturer.
Datasheet: TRF3722EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3722EVM Overview

Compatible with TRF3722. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Modulator Bulk is the packaging method for this product This product is designed TRF3722 amplifier. This product's 400MHz ~ 4.1GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This product is an TRF3722 evaluation module. This tool is designed for the TRF3722.

TRF3722EVM Image

TRF3722EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3722EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF3722
  • Series -
  • Product Evaluation Modules
  • Type Modulator
  • Packaging Bulk
  • For-Use-With TRF3722
  • Frequency 400MHz ~ 4.1GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Description-Function TRF3722 evaluation module
  • Tool-Is-For-Evaluation-Of TRF3722

TRF3722EVM

TRF3722EVM Specifications

TRF3722EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF3722

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Modulator.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TRF3722

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 400MHz ~ 4.1GHz.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TRF3722 evaluation module.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TRF3722

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$298.50
$298.50
10
$283.58
$2 835.75
100
$268.65
$26 865.00
500
$253.72
$126 862.50
1000
$238.80
$238 800.00
Top