TRF37A32EVM

Mfr. #: TRF37A32EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD FOR TRF37A32
Lifecycle: New from this manufacturer.
Datasheet: TRF37A32EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37A32EVM Overview

Compatible with TRF37A32. Product belongs to the - series. This product is categorized as Evaluation Boards Type: Mixer This product is designed TRF37x32 amplifier. This product's 400MHz ~ 1.7GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37x32. USB interface type

TRF37A32EVM Image

TRF37A32EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37A32EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37A32
  • Series -
  • Product Evaluation Boards
  • Type Mixer
  • For-Use-With TRF37x32
  • Frequency 400MHz ~ 1.7GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37x32
  • Interface-Type USB

TRF37A32EVM

TRF37A32EVM Specifications

TRF37A32EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is TRF37A32.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Mixer.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TRF37x32

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 400MHz ~ 1.7GHz

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TRF37x32

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$298.50
$298.50
10
$283.58
$2 835.75
100
$268.65
$26 865.00
500
$253.72
$126 862.50
1000
$238.80
$238 800.00
Top