TRF37B73EVM

Mfr. #: TRF37B73EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TRF37A73
Lifecycle: New from this manufacturer.
Datasheet: TRF37B73EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37B73EVM Overview

Compatible with TRF37B73. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Amplifier This product's 1MHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37B73.

TRF37B73EVM Image

TRF37B73EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37B73EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37B73
  • Series -
  • Product Evaluation Modules
  • Type Amplifier
  • Frequency 1MHz ~ 6GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37B73

TRF37B73EVM

TRF37B73EVM Specifications

TRF37B73EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF37B73

  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Amplifier.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 1MHz ~ 6GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF37B73.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top