TSC2046EVM

Mfr. #: TSC2046EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Touch Sensor Development Tools TSC2046 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TSC2046EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2046EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, SPI Interface IC package type: TSC2046 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2046.

TSC2046EVM Image

TSC2046EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2046EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, SPI Interface
  • Embedded No
  • Utilized-IC-Part TSC2046
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2046

TSC2046EVM

TSC2046EVM Specifications

TSC2046EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Resistive Touch Sensors

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 4-Wire Resistive Touch Screen Controller, SPI Interface.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TSC2046.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2046

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$9.42
$9.42
10
$8.95
$89.49
100
$8.48
$847.80
500
$8.01
$4 003.50
1000
$7.54
$7 536.00
Top