TSC2301EVM

Mfr. #: TSC2301EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Touch Sensor Development Tools TSC2301 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TSC2301EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2301EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: - IC package type: TSC2301 This product operates at a 6 V to 12 V supply voltage for reliable performance. This tool is designed for the TSC2301.

TSC2301EVM Image

TSC2301EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2301EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TSC2301
  • Operating-Supply-Voltage 6 V to 12 V
  • Tool-Is-For-Evaluation-Of TSC2301

TSC2301EVM

TSC2301EVM Specifications

TSC2301EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Resistive Touch Sensors.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TSC2301

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 6 V to 12 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2301

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$223.50
$223.50
10
$212.32
$2 123.25
100
$201.15
$20 115.00
500
$189.98
$94 987.50
1000
$178.80
$178 800.00
Top