TSW1265EVM

Mfr. #: TSW1265EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TSW1265
Lifecycle: New from this manufacturer.
Datasheet: TSW1265EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW1265EVM Overview

Compatible with ADS4249, LMH6521, LMK04800. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Signal Chain Bulk is the packaging method for this product This product's - range is 0Hz to 2.2GHz. Included item: Board. This tool is designed for the ADS4249.

TSW1265EVM Image

TSW1265EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW1265EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products ADS4249, LMH6521, LMK04800
  • Series -
  • Product Evaluation Modules
  • Type Signal Chain
  • Packaging Bulk
  • Frequency -
  • Supplied-Contents Board
  • Tool-Is-For-Evaluation-Of ADS4249

TSW1265EVM

TSW1265EVM Specifications

TSW1265EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is ADS4249, LMH6521, LMK04800.

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Signal Chain.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS4249

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$95.90
$95.90
10
$91.10
$911.00
100
$86.31
$8 630.55
500
$81.51
$40 755.40
1000
$76.72
$76 716.00
Top