TSW3070EVM

Mfr. #: TSW3070EVM
Manufacturer: Texas Instruments
Description: TSW3070EVM
Lifecycle: New from this manufacturer.
Datasheet: TSW3070EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW3070EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: DAC The Timing, Waveform Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDM7005, DAC5682Z, OPA695, THS3095 This product operates at a 2.8 V to 3.8 V supply voltage for reliable performance. This tool is designed for the DAC5682Z THS3095. SMA USB interface type

TSW3070EVM Image

TSW3070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3070EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type DAC
  • Main-Purpose Timing, Waveform Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDM7005, DAC5682Z, OPA695, THS3095
  • Operating-Supply-Voltage 2.8 V to 3.8 V
  • Tool-Is-For-Evaluation-Of DAC5682Z THS3095
  • Interface-Type SMA USB

TSW3070EVM

TSW3070EVM Specifications

TSW3070EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Waveform Generator

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed CDM7005, DAC5682Z, OPA695, THS3095

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.8 V to 3.8 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5682Z THS3095.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$777.24
$777.24
10
$738.38
$7 383.78
100
$699.52
$69 951.60
500
$660.65
$330 327.00
1000
$621.79
$621 792.00
Top