UCC3580EVM

Mfr. #: UCC3580EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR UCC3580
Lifecycle: New from this manufacturer.
Datasheet: UCC3580EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC3580EVM Overview

Product belongs to the - series. The AC/DC, Primary Side is the Main-Purpose. - voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 12V Flyback regulator topology 120W Included item: Board. IC package type: UCC3580 Board type: Fully Populated. The product has 1, Isolated outputs.

UCC3580EVM Image

UCC3580EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC3580EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Main-Purpose AC/DC, Primary Side
  • Voltage-Input -
  • Frequency-Switching -
  • Current-Output 10A
  • Voltage-Output 12V
  • Regulator-Topology Flyback
  • Power-Output 120W
  • Supplied-Contents Board
  • Utilized-IC-Part UCC3580
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Isolated

UCC3580EVM

UCC3580EVM Specifications

UCC3580EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is AC/DC, Primary Side.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed -

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is -.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 12V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Flyback

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is 120W.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is UCC3580.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Isolated

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$195.39
$195.39
10
$185.62
$1 856.20
100
$175.85
$17 585.10
500
$166.08
$83 040.75
1000
$156.31
$156 312.00
Top