UCC3889EVM

Mfr. #: UCC3889EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR UCC3889
Lifecycle: New from this manufacturer.
Datasheet: UCC3889EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC3889EVM Overview

Product belongs to the - series. The AC/DC, Primary Side is the Main-Purpose. 85 ~ 265 VAC voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 5V, 15V Flyback regulator topology 1.125W Included item: Board. IC package type: TPS77401, UCC3889 Board type: Fully Populated. The product has 2, Non-Isolated outputs.

UCC3889EVM Image

UCC3889EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC3889EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Main-Purpose AC/DC, Primary Side
  • Voltage-Input 85 ~ 265 VAC
  • Frequency-Switching -
  • Current-Output 120mA, 35mA
  • Voltage-Output 5V, 15V
  • Regulator-Topology Flyback
  • Power-Output 1.125W
  • Supplied-Contents Board
  • Utilized-IC-Part TPS77401, UCC3889
  • Board-Type Fully Populated
  • Outputs-and-Type 2, Non-Isolated

UCC3889EVM

UCC3889EVM Specifications

UCC3889EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is AC/DC, Primary Side.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 85 ~ 265 VAC

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed -

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 5V, 15V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Flyback.

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is 1.125W.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS77401, UCC3889.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 2, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$111.26
$111.26
10
$105.69
$1 056.92
100
$100.13
$10 012.95
500
$94.57
$47 283.40
1000
$89.00
$89 004.00
Top