VCA2619EVM

Mfr. #: VCA2619EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR VCA2619
Lifecycle: New from this manufacturer.
Datasheet: VCA2619EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2619EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 20MHz The 300 V/μs. Current-Output-Channel is 40mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2619 Board type: Fully Populated. The product has 2 - Dual channel per IC.

VCA2619EVM Image

VCA2619EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2619EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 20MHz
  • Slew-Rate 300 V/μs
  • Current-Output-Channel 40mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2619
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -

VCA2619EVM

VCA2619EVM Specifications

VCA2619EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Operating-Temperature?

    Q: The product Operating-Temperature is -40°C ~ 85°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Differential

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4.75 V ~ 5.25 V

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 20MHz.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 300 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 40mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Variable Gain.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is VCA2619.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 2 - Dual.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$153.75
$153.75
10
$146.06
$1 460.62
100
$138.38
$13 837.50
500
$130.69
$65 343.75
1000
$123.00
$123 000.00
Top